Showing posts with label Tofu Tower. Show all posts
Showing posts with label Tofu Tower. Show all posts

Wednesday, August 3, 2022

Rusty Rails Part Two - Engine Shed with a Side of Tofu!

One of the perks of model railroading is the freedom to work on whatever section or theme suits your mood, whether it be foundation, track laying, scenery, rolling stock, electrics, etc., etc.  Nonetheless, construction has now begun in earnest, so the first thing I decided to do was one of the primary structures, the engine shed.  The concept has been in the back of my mind for quite some time in many iterations.  But the basic structure is to hold/service engines.  Luckily a recent work project lent itself to being adapted for train use, rather than for its other more "lofty" function, so I modified and scaled the virtual model accordingly, and had it 3D printed.

A truss frame only partially clad, it is 10" long, 5" wide and 5" high.  It was scaled to fit the track plan, located on the lower left side of the layout.


That was the easy part.  What followed then were many evenings of scrounging various parts, greeblies and other bits and pieces from the many storage boxes.  Nothing was safe...  Eventually through alot of trial and error, the shed appeared.  It is very similar to a previous project of mine...


Earlier designs had a much larger crane on the upper platform, but it looked clumsy so I opted for a small gantry crane on I-beams.  


Surplus laser and 3D printed parts, various scale model bits from tanks, aircraft, & other sacrificial trains,  lots of good ole dollar store acrylic shapes, vitamin bottles, and of course, the now traditional Zaini egg, which has replaced the previous Kinder egg (due to the design change, and I have run out of the old style).  


 

I wanted it to look functional, with every part having a logical reason.  (You can get an idea of the scale if you look for the 00 gauge fellow in the high visibility vest).  One thing I waffled about was whether or not to include lighting.  Since there was no blueprint or plan, I had to wait until the model was finished and add the lights in post construction.  That was several hours of frustration weaving a 20 foot string of mini lights through the structure, starting at the two large tanks and working to the rear.  Most of the lights are inside.

With the lighting completed, the bulbs were masked and it was off to the "Cheap as Chips" spray booth for prime time!




The red oxide gives it a nice industrial/steel mill kind of vibe.  Also brings out much more detail.  The caps to mask the lights were not as effective, so I had to use a cotton bud with some white spirits to remove the paint.  An electrical test (which I forgot to photograph...) assured me all the lights were working.  I didn't want to go through that again!


There are still many small detail parts to be added, such as ladders (which are too fragile to include at this time).  Hopefully soon I will come up with some kind of colour scheme.  I have to avoid yellow and black as all of my switcher engines are that colour.  But there will be lots of graphics; signage, wasp strips and checkerboards, much like that previous model from a few years ago...  


And lets not forget about the weathering.  Those pastels, pigments, and washes will be getting quite the workout!  Stay tuned to this blog; it's going to be a few months before the final product will be ready.

Sunday, June 7, 2020

Skiffs

Part 6 of the "Tofu Tower" series will showcase the last two ships, which are the smallest (2" long each), permanently fixed to the tower, and were the first and last models made.  Both have no names; only functions.  And taxed my eyesight in the process!

The first skiff built took about a week.  More time spent scrounging than assembling.  I just wanted a basic little ship to mingle with the larger boats, but the inclusion of the tower changed that.   Here are a couple of shots of the "naked" and the primed model:




With all the other boats circling the tower, I thought making this a taxi would be logical.  What better way for the crews to be shuttled back and forth?  Currently it is moored above the "Zevon" tank waiting for a fare.  


The second skiff, the final model to be built, was a last minute addition inspired by a documentary series.  The wife and I had started watching this BBC show about the brave volunteers of the RNLI (Royal National Lifeboat Institution), so I decided to model a little nod to these many men and woman doing an extraordinary job!  Check it out if you get the chance!

The hull of the "Class B Lifeboat" is just a landing craft from a 1/700 Airfix kit.  Again not many greeblies left to finish it.  Unfortunately no primer shots were taken.


Gary Putz has been a very naughty boy!  He was up on one of the mooring masts doing some repairs, but he was in such a hurry, he didn't secure his fall arrest PPE!  All his tools plummeted 300 feet to the ground, and luckily he managed to grab onto the chain swaying in the wind below.  Even luckier for him the tower has an RNLI station...


Not only is Gary's pride ruined, (and his coveralls slightly soiled...) he is going to have to buy several rounds at Taffey's tonight to thank the lads for saving his ass.  


Again the figures are N scale Graham Farish.  The crew were actually fireman, but I repainted them in RNLI kit.  Remember, safety first!

Now look up, wayayayay up!  


That wraps it up for the "Tofu Tower".  The Mark II version is already planned, but it is going to be 00 gauge (1/76) this time!  Another project is already on the bench, but likely months away.  A hint as to the subject matter, "We got a Season 2!"  (And it's got nothing to do with Ian McQue!).

Saturday, May 9, 2020

The Tofu Tower

You may ask, why Tofu Tower?  For that answer we go back to 1982.  Before Ian McQue messed me up, there were many others who did one better years ago.  It was June and I had just finished viewing this little movie called "Blade Runner", and I haven't been the same since.  No need to go into the why; anyone touched by this film should understand.

So while I was starting work on the third flying ship, I realized I needed something for them to congregate around, so I imagined a little anchorage to have them either docked or flying about.  I had had the idea for this structure for quite some time; it was basically a combination of some Chris Foss paintings, primarily one called "The Face", and the Sushi Bar (tower) from "Blade Runner", which is my favorite building from the film.  (Maybe a little of the Hades flame-belching refinery too!)


Abandoning the ship, I set to work on the tower.  As you know I prefer to salvage and re purpose my modelling elements as much as possible, and use raw stock only as a last resort.  As an engineering modeler by day, I had this used model of a refinery tower with metal parts all ready and waiting!


And thus began many evenings and hours of scrounging for parts and literally anything I can get my hands on.  The omnipresent Kinder eggs, Zaini eggs, vitamin containers, bottle lids, and excess laser cutting (from work of course!).  Eventually I arrived at this core structure:


That red square on the right is actually just some support material from a 3D printer, but the weave makes it look more like a radiator.  Also pipe caps, a cab from an HO diesel, and structure parts from a big box of HO architectural shapes I got from Mister H!


Satisfied with the result from all angles, it was primer time.  I think my favourite part of modelling!



Now it was time to add details, graphics, and paint & weather the crap out of it!  Remember this is 1/148 and only 22" tall to the top of the radio mast.  From the beginning I had planned on saturating the tower with advertising, so I spent time on the internet compiling various images from (you guessed it!) that '82 film again, with a few other movie nods and related signage as well.  Before we proceed further, here is a handy guide for first time visitors to the tower:



Originally the painting started out as more vivid, but it just didn't work out.  I decided to stick to reds and rust tones with some subtle military greens and accents.  Makes the billboards stand out more.



Signage is lots of excess laser cutting, with the graphic printed on photopaper.  And then distressed and weathered of course!  The illuminated billboard was planned from the beginning.


It is a small 2" x 2" LED screen which was actually a key fob.  You can load images on it and program in a slide show.  Unfortunately the images don't show up well in photos, and you have to be almost directly in front to see them, but it is still a nice effect!  The large frame it rests in is removable for charging and reprogramming.  Too bad it doesn't have sound or moving images...


During construction of the tower, I was watching a series from the UK called "Saving Lives at Sea", a documentary about the brave volunteers from the RNLI (Royal National Lifeboat Institution).  With all the ships around I thought it would be a good idea to have one of the garage modules as a lifeboat station, and then model a small lifeboat in a rescue situation somewhere around the tower.  But we will go into this scenario on a later post...



Adding lights to the tower was a last minute decision.  I had a string of battery powered LEDs from the good ole dollar store, so I intertwined the bulbs and wires through the structure, making no effort to hide the wires.  Some of the bulbs I painted red for extra effect.  The battery box too is integrated into the model as the Generator Station:



Let's pay a visit to specific parts of the tower.  About midway up is "The Snake Pit".  A place for traditional shore leave.  The party has moved out onto the balcony!  On the roof are some tomato plants and other veg for the restaurant below, "Der Tofuhaus", and Omar's Garage is on the left.


Figures used are all N-scale from Graham Farish.  There are also some from Life-Like too.  Just below Taffey's place is the receiving dock.  Here the tower gets all the cargo and supplies it needs to operate; mostly food stuffs like other veg, rice, and tofu.  Liquor and penicillin is also shipped in for the other business above!  A cargo lighter is off loading, and we will discuss this ship again at a later date.


That cracked paint effect on the diesel tank was a bonus.  The previous yellow was too intense so I painted over it with a dirty red.  The paints were incompatible so it shrank when it dried.  I'm not complaining...  As for weathering, many hours were spent with dry brushes, washes and pastels.  I like to use an orange over the usual red oxides out there.  Look at a rusty chunk of iron; you may be surprised how many hues are present.


Moving to the top we see the taxi waiting for a fare, and another ship circling the tower.  Higher up, the lifeboat crew is answering a call.  That black square up there is the LED billboard.


At the top of the tower are the masts and radio tower.  Next to the BP sign is the vaporator.  The flexible piping is made from coil springs.


Well, it's getting that time again.  And after all this, still no answer to the topic sentence.  Why Tofu Tower...?   As it is loosely based on the Sushi Tower from that film, I altered the name according to my lifestyle.  As a long term vegan who does not eat fish, but who does eat large quantities of tofu, I thought it appropriate!


Next time, we will be visiting the individual ships; their construction and back story.

Saturday, May 2, 2020

I hate you, McQue....

Once upon a time, (modelling) life was simple.  I was content to build kits and scratch build from various Gerry Anderson series, assorted Sci-Fi television and movies, and Japanese anime mechs from the 80's & 90's.  And then it happened; I stumbled across a posting in "Concept Ships" featuring  the work of artist Ian McQue.  His colour palate and subjects of flying junk boats traversing through the air, defying gravity on some future/past Earth or other planet was inspiring!  This was 10 years ago, and from then on he has lived in my head rent free.  Since that time I have built two flying ships (see previous posts of the Cargo Barge Regina & Towboat Jean), and all the time the urge to build more as always been there.  So in the hope that if I built one more boat, I could get back to "normal" modelling.  Unfortunately, this did not work.  And the project got out of control.  What was to be one little ship mushroomed into a diorama of sorts comprising of five ships, plus a central structure to tie them all together.  The result, The Tofu Tower!


The Tofu Tower is a run down, grotty little anchorage off of the main shipping routes.  Ships and sailors who frequent this establishment want to avoid inspections and other authorities.  Here they can replenish themselves with food, water, fuel, repairs, and most important, companionship!  There is also a restaurant, a taxi service, and with all the comings and goings, an RNLI station.




For this project, I decided to change the scale so I could build bigger, but take up less space in the display cabinet.  (That is always the problem with modelling; where to put them afterwards...).  The previous ships were built at 1/35, but this time I chose 1/148, which was British N scale.  The tower is 24" high, which is almost 300 feet high in "reality".  The five ships range in size from 2" to 8".  Three are fixed/moored to the tower.


I didn't want the display to be fixed, so I came up with the idea of having movable components.  Using a steel base, I fixed magnets to the underside of the tower and aluminium plates for the two ships which allow to put them anywhere I want.  Unfortunately the acrylic rods holding up the ships are permanent, but this gives the height variation as well.  I lost track of how many months I worked on this.  It must be at least 9 months, as I only get 1 to 2 hours at most in an evening to model.  Now here are some nice close up blue sky shots!


This low angle view shows some of the many billboards, a few condenser units, and to the right, the taxi.   Here we see the most popular establishment on the tower, as well as the roof gardens.  It was all so rusty and bleak out there....


Much more of the tower, it's features, elements and construction will be discussed and described in the next post.  And the assorted ships will be done in good time as well.  But it's getting late so last call and lights out, sailors!